St. Paul’s Catholic College


Renewable Energy - Solar PV and ASHP Systems

Project site:

St. Paul’s Catholic College, Burgess Hill RH14 8GA

Client:

BOSCO Education Trust

Consultant:

Barker Associates

Completion Date

February 2025

 Solar PV – Supply and Installation

  • 218 No. Perlight 450W Roof mounted Solar
    Panels on 2 South Facing Roofs.
  • 109 No. solar Edge Optimisers
  • 2 No. Solar Edge Invertors with Total Capaclty of
    83.3KW

ASHP - Supply and Installation

  • Strip out Gas boilers, flues and pipework
  • 4 No 75KW Clivet Air Source Heat Pumps
  • 2 No 1000Lt Buffer Vessels
  • 3 No. 80KW Voltius Electric Boilers
  • Pipework, Fittings, Valves, and Insulation
  • Mikrofil 3 Pressurisation unit and Expansion
    Vessel
  • Dirt Separator, dosing pot and Heat Meter
  • Mains Cabling and Switchgear
  • Control panel Upgrade c/w Trend BMS
  • 72m2 concrete base for ASHP’s
  • Builders work for the new installation
  • Trenching and laying of 20 metre of Pre
    insulated underground pipework and power
    supply cables to ASHP base
  • Hot water system served from gas boiler and
    Heat Exchanger