Barking Abbey Secondary School


Replacement of Boiler Plant and associated Controls system

Project site:

Barking Abbey Secondary School, Longbridge Campus

Client:

My Place, London Borough of Barking & Dagenham

Duration:

10 Weeks

Value Circa:

£ 158,000

Objective:

To provide the most efficient, dependable, and cost-effective sustainable heating solution

 

Strip out works

  • Existing plant, associated controls, wiring and pipework.
  • Existing boiler flues.

Supply and Installation

  • 8No Worcester 100 KW GB162 gas fired condensing boilers
  • New flues within existing chimney
  • Installation of Brazed Heat Exchanger
  • Grundfos Invertor twin pump sets
  • Flamco twin system pressurisation unit
  • Magnetic filtration and dosing pots.
  • Expansion vessels, pipework, and Insulation.
  • Complete new Trend BMS controls system and associated equipment
  • Conduct electrical wiring and earth bonding.
  • Provide new lighting and gas detection system

 Conduct all necessary builders work in connection with the new installation.